Radisson SAS Hotel, Stansted

A 500-bedroom, four-star Radisson SAS hotel is being constructed at Stansted Airport. With a large proportion of the block work below ground level, systems that would provide fast-track construction without sacrificing quality were of paramount importance.

Bansal Building (London) Ltd, together with main contractor Skanska, chose CPI’s remote mortar mixing station as the solution to the time and space restrictions. It contains factory-produced pre-mixed dry mortar for fast and efficient site production at the touch of a button.

The system produces guaranteed mix proportions ensuring correct colour and consistency. Site wastage is also kept to a minimum as only the amount of mortar required needs to be produced.


Further information or access to any photographs contact Mick Russell at Mick Russell@mineralproducts.org or call 020 7963 8000.

 
 
Data sheets

No. 3 - MPA Mortar Data Sheet

You are in: Case studies > Casestudy07

In this section

Print PagePrintable page
Top of page I Disclaimer I Download guide I Sitemap I MPA Mortar on Linkedin
Enter the dedicated MPA members websiteMPA Mortar, 1st Floor, 297 Euston Road, London, NW1 3AD
Tel: 0203 978 3400 Email: mpamortar@mineralproducts.org