MPA Mortar part of the Mineral Products Association (MPA)
 

mpa mortar

quality factory-produced
mortar since 1971

 
 

Case studies

Park Central, Birmingham

Europe’s largest urban development, Park Central, will contain more than 1,400 homes, together with some 26,500 square metres of commercial space.

Up to 14 silos were required in order to maintain a supply of factory-produced mortar of the quality and consistency needed for this major project.

The silo system not only guarantees mix proportions but also significantly reduces wastage. Silos are refilled by CPI’s nationwide tanker fleet as required, to ensure a continuous supply of quality mortar.


Further information or access to any photographs contact Mick Russell at Mick Russell@mineralproducts.org or call 020 7963 8000.

 
 
Data sheets

No. 3 - MPA Mortar Data Sheet

 
You are in: Case studies > Casestudy05

In this section

Print PagePrintable page
Top of page I Disclaimer I Download guide I Sitemap I MPA Mortar on Linkedin
Enter the dedicated MPA members websiteMPA Mortar, 1st Floor, 297 Euston Road, London, NW1 3AD
Tel: 0203 978 3400 Email: mpamortar@mineralproducts.org