Mortar Industry Association (MIA) part of the Mineral Products Association (MPA)
 

mia

mortar industry association

 
 

Case studies

Park Central, Birmingham

Europe’s largest urban development, Park Central, will contain more than 1,400 homes, together with some 26,500 square metres of commercial space.

Up to 14 silos were required in order to maintain a supply of factory-produced mortar of the quality and consistency needed for this major project.

The silo system not only guarantees mix proportions but also significantly reduces wastage. Silos are refilled by CPI’s nationwide tanker fleet as required, to ensure a continuous supply of quality mortar.


Further information or access to any photographs contact Gearoid Kennedy at Gearoid.Kennedy@mineralproducts.org or call 020 7963 8000.

 
 
Data sheets

No. 3 - MIA data sheet

 
You are in: Case studies > Casestudy05

In this section

Print PagePrintable page
Top of page I Disclaimer I Download guide I Sitemap
Enter the dedicated MPA members websiteMIA, Gillingham House, 38-44 Gillingham Street, London SW1V 1HU
Tel: 020 7963 8000 Fax: 020 7963 8001 Email: mia@mineralproducts.org